===== Room temperature and lighting control ===== | ===== Room temperature and lighting control ===== | ||
- | Your task is to create a system for controlling heating and lighting in a single room. All required components are contained in the certification kit. Start with building the kit, using {{ :cs:sw:01-mervis:schema_xs10.pdf |this connection scheme}} as a guide. | + | Your task is to create a system for controlling heating and lighting in a single room. All required components are contained in the certification kit. Start with building the kit, using {{ :cs:sw:01-mervis:schema_xs11.pdf |this connection scheme}} as a guide. |
Room heating control consists of: | Room heating control consists of: | ||
Line 32: | Line 32: | ||
Assembly of the certification kit | Assembly of the certification kit | ||
- | * fasten DIN rail holders to both the Axon S105 controller and the xS10 extension module using the provided screws | + | * fasten DIN rail holders to both the Axon S105 controller and the xS11 extension module using the provided screws |
- | * mount the controllers, terminals and relays to the DIN rail according to {{:cs:sw:01-mervis:schema_xs10.pdf |this scheme}} | + | * mount the controllers, terminals and relays to the DIN rail according to {{:cs:sw:01-mervis:schema_xs11.pdf |this scheme}} |
* interconnect blue terminals with the 2-way jumper | * interconnect blue terminals with the 2-way jumper | ||
* interconnect red and grey terminals with the 3-way jumper | * interconnect red and grey terminals with the 3-way jumper | ||
* insert the resistance housing into the grey terminal | * insert the resistance housing into the grey terminal | ||
- | * connect all cables and conductors according to {{:cs:sw:01-mervis:schema_xs10.pdf |the scheme}} | + | * connect all cables and conductors according to {{:cs:sw:01-mervis:schema_xs11.pdf |the scheme}} |
* prior to connecting the power source, check the correct voltage polarity | * prior to connecting the power source, check the correct voltage polarity |