Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
en:sw:01-mervis:07-certification [2020/03/10 08:46] jan_kozak |
en:sw:01-mervis:07-certification [2020/10/07 07:21] mkudlacek |
||
---|---|---|---|
Line 8: | Line 8: | ||
===== Room temperature and lighting control ===== | ===== Room temperature and lighting control ===== | ||
- | Your task is to create a system for controlling heating and lighting in a single room. All required components are contained in the certification kit. Start with building the kit, using {{ :cs:sw:01-mervis:schema_xs11.pdf |this connection scheme}} as a guide. | + | Your task is to create a system for controlling heating and lighting in a single room. All required components are contained in the certification kit. Start with building the kit, using {{ :en:sw:01-mervis:schema_s103_xs11_.pdf |this connection scheme}} as a guide. |
Room heating control consists of: | Room heating control consists of: | ||
Line 38: | Line 38: | ||
* Insert the resistance housing into the grey terminal | * Insert the resistance housing into the grey terminal | ||
* Connect all cables and conductors according to {{:cs:sw:01-mervis:schema_xs11.pdf |the scheme}} | * Connect all cables and conductors according to {{:cs:sw:01-mervis:schema_xs11.pdf |the scheme}} | ||
- | * Prior to connecting the power source, check the correct voltage polarity | + | * Before connecting the power source, check the correct voltage polarity |