 ===== Room temperature and lighting control ===== ===== Room temperature and lighting control =====
-Your task is to create a system for controlling heating and lighting in a single room. All required components are contained in the certification kit. Start with building the kit, using  {{ :cs:​sw:​01-mervis:​schema_xs11.pdf |this connection scheme}} as a guide.+Your task is to create a system for controlling heating and lighting in a single room. All required components are contained in the certification kit. Start with building the kit, using  {{ :en:​sw:​01-mervis:​schema_s103_xs11_.pdf |this connection scheme}} as a guide.
    
-Room heating control consists of:  +<​html><​span class="​kbBlueText">​Assembly of the certification kit:</​span></​html>​ 
-  * Controlling a heater using RE2 relay+  * Fasten DIN rail holders to both the Patron S107 unit and the xS11 extension module using the provided screws 
 +  * Mount the units, terminals and relays to the DIN rail according to {{ :​en:​sw:​01-mervis:​schema_s103_xs11_.pdf |this scheme}} 
 +  * Interconnect blue terminals with the 2-way jumper 
 +  * Interconnect red and grey terminals with the 3-way jumper 
 +  * Insert the resistance housing into the grey terminal 
 +  * Connect all cables and conductors according to {{ :​en:​sw:​01-mervis:​schema_s103_xs11_.pdf |the scheme}} 
 +  * Before connecting the power source, check the correct voltage polarity 
 +  
 +<​html><​span class="​kbBlueText">​Room heating control consists of: </​span></​html>​ 
 +  * Controlling a heater using relay (RE2)
   * Temperature measurement using the PT1000 resistance thermometer   * Temperature measurement using the PT1000 resistance thermometer
   * Using a programmable week scheduler for setting the required temperature   * Using a programmable week scheduler for setting the required temperature
Line 18: Line 27:
   * Displaying a current heater status through a web HMI   * Displaying a current heater status through a web HMI
    
-Lighting control consists of: +<​html><​span class="​kbBlueText">​Lighting control consists of: </​span></​html>​
   * Control of a single lighting circuit through a relay (RE1)   * Control of a single lighting circuit through a relay (RE1)
   * Physical lighting control using the red button   * Physical lighting control using the red button
   * Lighting control using a web HMI   * Lighting control using a web HMI
  
-Recommended methods+<​html><​span class="​kbBlueText">​Recommended methods:</​span></​html>​
   * Implement the hysteresis control ("​On-Off Control - Heating (B31)" block)   * Implement the hysteresis control ("​On-Off Control - Heating (B31)" block)
   * Use "Real Scheduler (T18)" block for creating the timetable   * Use "Real Scheduler (T18)" block for creating the timetable
   * Transform the potentiometer output value to 3-/+3 using a linear transformation   * Transform the potentiometer output value to 3-/+3 using a linear transformation
   * Connect the lighting control button to the relay using the Direct Switch Toggle function   * Connect the lighting control button to the relay using the Direct Switch Toggle function
-  * For simultaneous control of the Direct Switch output, use the library provided+  * For simultaneous control of the Direct Switch output, use the Force Output register
   * Encapsulate the whole solution into a single function block for better convenience   * Encapsulate the whole solution into a single function block for better convenience
-  
-Assembly of the certification kit 
-  * Fasten DIN rail holders to both the Axon S105 controller and the xS11 extension module using the provided screws 
-  * Mount the controllers,​ terminals and relays to the DIN rail according to {{:​cs:​sw:​01-mervis:​schema_xs11.pdf |this scheme}} 
-  * Interconnect blue terminals with the 2-way jumper 
-  * Interconnect red and grey terminals with the 3-way jumper 
-  * Insert the resistance housing into the grey terminal 
-  * Connect all cables and conductors according to {{:​cs:​sw:​01-mervis:​schema_xs11.pdf |the scheme}} 
-  * Prior to connecting the power source, check the correct voltage polarity