Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
en:sw:01-mervis:07-certification [2021/05/04 07:35]
avsetula [Room temperature and lighting control]
en:sw:01-mervis:07-certification [2022/01/12 10:09]
avsetula
Line 11: Line 11:
    
 <​html><​span class="​kbBlueText">​Assembly of the certification kit:</​span></​html>​ <​html><​span class="​kbBlueText">​Assembly of the certification kit:</​span></​html>​
-  * Fasten DIN rail holders to both the Neuron S103 controller ​and the xS11 extension module using the provided screws +  * Fasten DIN rail holders to both the Patron S107 unit and the xS11 extension module using the provided screws 
-  * Mount the controllers, terminals and relays to the DIN rail according to {{ :​en:​sw:​01-mervis:​schema_s103_xs11_.pdf |this scheme}}+  * Mount the units, terminals and relays to the DIN rail according to {{ :​en:​sw:​01-mervis:​schema_s103_xs11_.pdf |this scheme}}
   * Interconnect blue terminals with the 2-way jumper   * Interconnect blue terminals with the 2-way jumper
   * Interconnect red and grey terminals with the 3-way jumper   * Interconnect red and grey terminals with the 3-way jumper