Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
en:sw:01-mervis:07-certification [2021/05/04 07:34] avsetula [Room temperature and lighting control] |
en:sw:01-mervis:07-certification [2022/04/11 08:37] (current) avsetula [Mervis certification] |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Mervis certification ====== | ====== Mervis certification ====== | ||
- | Certification programme is intended for those interested in [[https://www.unipi.technology/become-partner|Unipi partnership programme]]. The certification is contingent upon completing a certification task in the form of a practical automation solution using the Unipi certification kit. | + | Certification program is intended for those interested in [[https://www.unipi.technology/become-partner|Unipi partnership programme]]. The certification is contingent upon completing a certification task in the form of a practical automation solution using the Unipi certification kit. |
<WRAP center round info 60%> | <WRAP center round info 60%> | ||
Line 9: | Line 9: | ||
===== Room temperature and lighting control ===== | ===== Room temperature and lighting control ===== | ||
Your task is to create a system for controlling heating and lighting in a single room. All required components are contained in the certification kit. Start with building the kit, using {{ :en:sw:01-mervis:schema_s103_xs11_.pdf |this connection scheme}} as a guide. | Your task is to create a system for controlling heating and lighting in a single room. All required components are contained in the certification kit. Start with building the kit, using {{ :en:sw:01-mervis:schema_s103_xs11_.pdf |this connection scheme}} as a guide. | ||
+ | |||
+ | <html><span class="kbBlueText">Assembly of the certification kit:</span></html> | ||
+ | * Fasten DIN rail holders to both the Patron S107 unit and the xS11 extension module using the provided screws | ||
+ | * Mount the units, terminals and relays to the DIN rail according to {{ :en:sw:01-mervis:schema_s103_xs11_.pdf |this scheme}} | ||
+ | * Interconnect blue terminals with the 2-way jumper | ||
+ | * Interconnect red and grey terminals with the 3-way jumper | ||
+ | * Insert the resistance housing into the grey terminal | ||
+ | * Connect all cables and conductors according to {{ :en:sw:01-mervis:schema_s103_xs11_.pdf |the scheme}} | ||
+ | * Before connecting the power source, check the correct voltage polarity | ||
<html><span class="kbBlueText">Room heating control consists of: </span></html> | <html><span class="kbBlueText">Room heating control consists of: </span></html> | ||
- | * Controlling a heater using RE2 relay | + | * Controlling a heater using relay (RE2) |
* Temperature measurement using the PT1000 resistance thermometer | * Temperature measurement using the PT1000 resistance thermometer | ||
* Using a programmable week scheduler for setting the required temperature | * Using a programmable week scheduler for setting the required temperature | ||
Line 28: | Line 37: | ||
* Transform the potentiometer output value to 3-/+3 using a linear transformation | * Transform the potentiometer output value to 3-/+3 using a linear transformation | ||
* Connect the lighting control button to the relay using the Direct Switch Toggle function | * Connect the lighting control button to the relay using the Direct Switch Toggle function | ||
- | * For simultaneous control of the Direct Switch output, use the library provided | + | * For simultaneous control of the Direct Switch output, use the Force Output register |
* Encapsulate the whole solution into a single function block for better convenience | * Encapsulate the whole solution into a single function block for better convenience | ||
- | |||
- | <html><span class="kbBlueText">Assembly of the certification kit:</span></html> | ||
- | * Fasten DIN rail holders to both the Neuron S103 controller and the xS11 extension module using the provided screws | ||
- | * Mount the controllers, terminals and relays to the DIN rail according to {{ :en:sw:01-mervis:schema_s103_xs11_.pdf |this scheme}} | ||
- | * Interconnect blue terminals with the 2-way jumper | ||
- | * Interconnect red and grey terminals with the 3-way jumper | ||
- | * Insert the resistance housing into the grey terminal | ||
- | * Connect all cables and conductors according to {{ :en:sw:01-mervis:schema_s103_xs11_.pdf |the scheme}} | ||
- | * Before connecting the power source, check the correct voltage polarity |